Bury St Edmunds

🚨 Before & After Alert in Bury St Edmonds! 🚨

Bury St Edmonds
Bury St Edmonds

We were called out to a Kee sewage treatment plant in Bury St Edmunds that was in serious need of some TLC. 🛠️
This system hadn’t been maintained for quite a while — but no worries, the Nugent Pump Services team got it back on track in no time! 💪
✅ Routine maintenance
✅ System inspection
✅ Expert care
If your system’s been a little neglected, don’t wait — get in touch today!
📞 01522 794976
SewageTreatment PumpServices BuryStEdmunds NugentPumpServices KeeSystem BeforeAndAfter WastewaterMaintenance

See more on our LinkedIn Page!

Victoria Street

🛠️ Challenging PPM at Victoria Street, Westminster

Victoria Street
Victoria Street

Last week, our team tackled a dual foul pumping station deep in the basement of an office block — a tight space, but no problem for our experienced engineers.
✅ Planned
✅ Precise
✅ Professional
Another job done with efficiency and top-tier service!
#NugentPumpServices #PPMMaintenance #VictoriaStreet #Westminster #PumpingStation #Efficiency #CustomerService

Alfred Tennyson Building

🚨 Call-Out to University of Lincoln – Alfred Tennyson Building 🚨

Alfred Tennyson Building
Alfred Tennyson Building
ATB

Our team was recently called to site to investigate a suspected pump failure at the Alfred Tennyson Building on the University of Lincoln campus.

After removing the unit and carrying out a full inspection at our workshop, we found complete winding failure and both the top and bottom mechanical seals had failed. 🔧⚙️

The pump is now being assessed for repair or replacement to get everything back up and running smoothly. 💡💪

#PumpFailure #EngineeringSolutions #UniversityOfLincoln #MechanicalMaintenance #OnSiteCallOut #AlfredTennysonBuilding

Didcot

🚧 Busy week in Didcot for our team! 💪

Didcot
Didcot
Didcot

We’ve been hard at work completing 2x PPM services on dual foul pumping stations for one of our valued clients. ✅

Here’s what we covered:
🔧 Pumps removed and fully serviced
⚡ Full electrical testing
🔄 Float switches tested for auto control
🚨 High-Level Alarm checks
🔁 Stepping relay tested for duty/standby mode
🧼 Pump station cleaned top to bottom
📝 Comprehensive report issued with priority codes:
🔴 Urgent | 🟠 Within 3 months | 🟢 Within 6 months

Keeping things flowing smoothly 👊 #PPM #PumpingStations #Engineering #WaterManagement #PreventativeMaintenance #TeamWork

Panel
Control Panel